GRL Information | Warmly welcome Zheng Qifeng, a senior engineer of Xiamen ABB low -voltage electrical equipment Co., Ltd. to visit our company and guide our work!
On December 2, 2022, Zheng Qifeng, a senior engineer of Xiamen ABB low -voltage electrical equipment Co., Ltd., visited Zhejiang GRL Electric Co., Ltd.grl group to visit and guide and exchange.
GRL Electrical General Manager David Li, Ni Jufeng, Operations Vice President Ni Jufeng, Fan Lin, Technician Fan Lin, Deputy Chief Worker Wu Hui, Technical Consultant Xu He, Sales Director Yi Youping, Product Director Luo Yong, etc.
Zheng Gong’s purpose is to inspect GRL electrical and conduct technical exchanges on related products in order to in -depth cooperation in the later period.guide our work
David Li extended a warm welcome to Zheng Gong’s arrival, and also hoped that Zheng Gong could make precious suggestions for GRL.
The meeting entered the topic. First, Director Yi introduced the existing situation of GRL electrical to Zheng Gong.guide our work
Subsequently, the R & D team’s R & D team operation team, for the technical standards, technical technologies, quality control, and industry applications of related products, conducted in -depth exchanges with Zheng Gong.
Due to the impact of the epidemic, ABB China is responsible for managing the melting core and melting switch market and sales of Manager Luan Zhaojing.
Zheng Gong then visited the GRL Gold Workshop, the fuse workshop and the assembly workshop.guide our work
Zheng Gong recognized the management of our factory. He said that 5S is very common in assembly workshops, but there are fewer people who can do it in mold workshops and gold workshops.guide our work
GRL can consider each detail and pursue the spirit of continuous improvement, so that he admires him.
Considering the problem of fatigue operation of employees, GRL invested a large number of fixtures to ensure safety production.
At the same time, in order to ensure the consistency and quality of the product, a large number of work inspections are also put in. At this point, Zheng Gong also recognized.guide our work
Subsequently, the operation and R & D team of GRL, for the technical standards, technical and technological process, quality control, industry application and other dimensions of related products, conducted in -depth exchanges with Zheng Gong.
Zheng Gong also visited the GRL Inspection Center that was just renovated. He has a laboratory with such a complete testing device for our company, which is shocked.
He said: Perfect laboratories can quickly respond to the new needs of customers, so that the sustainable development of enterprises can develop vitality and endogenous driving force. This trip has benefited me a lot, too much is worth our learning.
In the end, Zheng Gong expressed his gratitude to President Liu again, and also invited President Liu. Welcome GRL and his party to visit Xiamen ABB.
View grl group information